MEPCO New Connection
MEPCO New Connection can now be made easily by visiting the https://enc.com.pk/ website, online and completing MEPCO’s online application form for a new connection or visiting the nearest Customer Facilitation Center.
Follow the picture given below to start your MEPCO enc online meter application form.
Select MEPCO in Distribution Company, then select your Category Type from 150kW to above 500kW. Select your Sub Division and enter your Reference No, you can find it in your mepco bill, lastly, select your connection type.
New Connection Application Form
Here is a detailed step by step form, to fill out your ENC mepco new connection online application.
1. Proceed to the Applicant’s Particulars.
- If you own a home then select LandlordOwner, if it’s on a rental basis select Tenant.
- For Present Address, you will provide your current address in which you are residing
- For mobile number, you have two mobile number options, it’s important to provide accurate and active mobile numbers to avoid any inconvenience.
2. Next move on, to Contact Person Information details.
- Remember, if your contact person, mobile number 1, and permanent address are the same as above section. Simply, tick the box the same as above.
- Enter, your active email address.
3. Now fill in your Premises Detail.
- Select the of meter that’s already installed for your home from 0-10.
- Enter your home address where a meter is installed.
- Give your minimum load from 1-15 in KWh.
4. Attachments required are listed below.
- Remember, upload all images in JPG or PDF format, If you don’t know how to get this format. Simply, convert images to these formats by searching for a converter in your browser.
- Attach your Property Document Copy.
- A CNIC Copy of yours is needed with attestment.
- A CNIC Copy of the Witness is required.
- Your neighbor’s Electricity Bill Copy.
- Lastly Wiring Contractor’s Test Report.
5. Last but not least Terms and Conditions
- Recheck all given information, as it cannot be edited later.
- Read the Terms and Conditions carefully and tick the box I Agree.
- Complete Captcha and Submit it.
- Now you can simply print enc application.
MEPCO ENC New Connection Application Tracking
Once you’re done submitting your Wapda new connection form. You can now track your mepco enc new connection status. After submission,
you will be given a receipt along with a unique tracking number to track your form or application, if you are not able to find your tracking number track it through your CNIC number.
- Head to a new connection mepco tracking website.
- Select Application Type New Connection.
- Select Company Name MEPCO.
- Enter your Tracking ID or CNIC number without dashes.
- Submit it.
Mepco New Connection Demand Notice 2024
After submitting all your documents given above by following the steps, MEPCO will issue a demand notice. This notice will include the estimated cost and security deposit for the new connection.
The demand notice amount varies according to several factors costing from 7000 to 10000 fee for a new connection. You will have to pay this at an authorized bank and submit the payment receipt to the MEPCO office.
Once the payment is verified installation process starts for a meter. Stay active on the given phone numbers and emails.
Mepco Complaint Contact Numbers
Below are some contact numbers of mepco for complaints, report issues, or inquire about any services pending. You can even search a customer complaint management system for mepco online.
- MEPCO Helpline (Toll-Free): 0800-63726
- Customer Service Center: 061-9220198
- MEPCO Regional Office: 061-9210334
- Emergency/Technical Complaints: 118
FAQ’S
What is the mepco online meter application?
The Mepco online meter application is a way of submitting your new connection form online without any physical paperwork.
Can I print the mepco new connection demand notice?
Yes, you can print your mepco new connection demand notice, visit the website, enter your application reference number, and download it to print.
How to apply for a new electricity meter connection?
MEPCO BILL CHECK and Visit the MEPCO website, fill out your new connection application form, upload the required documents in the given format, and submit the form online. After you pay a fee, you will receive a demand notice.